Accessibility Tools

+1 (302) 703 9859
Human Translation
AI Translation

Silhouette of a constellation depicting a crab, set against a starry night sky.

A digitally constructed image depicting a constellation from the Mazzaroth set against a starry night sky. The constellation is outlined in glowing blue lines which connect important stars, emphasized by green and yellow curvilinear paths suggesting an orbital or celestial alignment.

 

In the following pages, you will discover the sign of the Son of man like never before—the same sign that Jesus spoke of in Matthew 24 when describing the end of the world, which shows how close we are to the end. That sign has been unfolding in the heavens since March 12, 2023, and now you will see what place it has in the book of Revelation. Once its role is understood, it becomes a precise timepiece from which we can read some important dates in relation to Bible prophecy—some upcoming, some already passed.

Three comets in the sign of the Son of man are making their way, one after the other, into the constellation of Lepus,[1] which represents the enemies of God, who are to become His footstool as studied in The Unclean Hare and the Pineapple. The first two have already entered, and as the first one did, a huge coronal mass ejection (CME) that had belched from the sun smote the earth, producing a severe geomagnetic storm with auroras visible as far south as the US-Mexico border![2] As the second entered, bank failures renewed fears of more collapses to come. Are these a hint as to what one could expect when the third comet enters on May 10, 2023?

A rapid-fire sequence of pivotal events is unfolding on the earth: the financial reset with the new global CBDC is poised to affect everyone on this planet, both small and great, rich and poor, bringing the world into bondage as the commonwealth’s first king in 70 years is to be imminently crowned in advance. Not only are socio-political events taking place, but solar threats, geological activity, and the sure word of prophecy all indicate that we are living on the cusp of a new world.

Much secular thought is devoted to what the future will look like because of technological innovation. From artificial intelligence to fusion power generation to rocket science to genetic engineering—on every front, humanity’s achievements are opening the door to irreversible changes in the world that will ultimately destroy it. This is the outlook of secular thought leaders everywhere, from Elon Musk down to the makers of today’s entertainment media. There is simply no denying that the world is ending—the only difference of opinion lies in “how” the world will end, and what the future will look like with ever increasing restrictions of freedom on all fronts.

The Lord will intervene to deliver His oppressed children, and the sign of the Son of man is the revelation of this deliverance from the enemies of righteousness. Much about the timing of that battle and the deliverance that will take place is signified in the sign of the Son of man, from the time when comets S3, E3, and K2[3] are in the constellation of Lepus.

A detailed celestial chart displaying various constellations under a starry sky. Highlights include Canis Major and Lepus with outlined figures of a large dog and a rabbit, respectively. Bright stars, Sirius and Rigel, are labeled. Lines connecting the stars form the shapes of the celestial figures, overlaid with geometric boundary lines and celestial coordinates.

As you continue reading, you will clearly see how the Revelation depicts the sign of the Son of man and gives some hints about the timing of earth-shaking events to take place at this time, especially the global financial situation. More about the societal implications for the world will be shared in an upcoming article. May you be sheltered from the stormy days ahead by heeding the counsel from the Lord to look up with understanding to what He is revealing and act according to His call to come out of Babylon before she receives her plagues.

And when these things begin to come to pass [plagues and woes], then look up [to behold the prophesied Sign of the Son of man], and lift up your heads; for your redemption [the Son of man] draweth nigh. (Luke 21:28)

The Last Sign

As Christians, we have the words of Jesus concerning the end of the world. He had an even clearer view into the future than today’s best minds, and His sayings are more pertinent now than they have ever been. The challenge for Christians is to bring Christ’s words into the context of the present world and the changes it is undergoing. It is too easy to limit ourselves to the traditional ways of understanding scripture and fail to allow our understanding to grow in proportion to the technological and societal changes that have unfolded in recent years.

As Daniel was instructed, there was a time to seal and preserve the sacred knowledge, and there is also a time to run to and fro in the word of God to increase knowledge.

But thou, O Daniel, shut up the words, and seal the book, even to the time of the end: many shall run to and fro, and knowledge shall be increased. (Daniel 12:4)

We are in the latter phase of that teaching; we must increase our knowledge because we are in the “time of the end”—the end of this world as we know it which will soon take place. Yet how many are settled into their own beliefs, which lead them to treat large parts of prophetic Scripture with apathy, instead of ever seeking to better understand God’s word.

One must study the Bible line upon line, comparing one scripture with another. One of Christ’s most detailed sermons regarding the end of the world was spoken in direct answer to the disciples who asked Him point-blank what the sign of the end of the world would be.

And as he sat upon the mount of Olives, the disciples came unto him privately, saying, Tell us, when shall these things be? and what shall be the sign of thy coming, and of the end of the world? (Matthew 24:3)

In His response, Jesus said many things that were beyond the possibility of the men of that age to comprehend, but His words were treasured for the generations to come to give light to everyone who would keep the faith of Jesus. Today, the end has already begun, and the promise of His return to save His people stands as sure as the day He spoke those words:

And then shall appear the sign of the Son of man in heaven: and then shall all the tribes of the earth mourn, and they shall see the Son of man coming in the clouds of heaven with power and great glory. (Matthew 24:30)

Yes, this world is ending. Our only hope is to look to the Faithful Witness, the Forerunner who went before us,[4] who is represented in the sign of the Son of man for all the world to see.

The Sign of the Son of Man in Revelation

It is critical to know by what authority we claim that the sign we share is indeed THE sign of the Son of man. Some attempt to declare certain brief, heavenly events to be the sign of the Son of man as they try to squeeze the idea into their assumed timeframe, which is usually just a few days into the future. But their declaration doesn’t make it so—and neither does ours. But if there is sound biblical evidence that can be presented for why this sign is what Jesus was referring to, then any sincere follower of Christ who is seeking the truth (rather than just trying to support their own shortsighted ideas) should willingly embrace it and proclaim it.

The sign of the Son of man was first revealed to the world on January 23, 2023, in the article, The Sign Has Appeared. Since then, the Lord has given an immense flood of light about the Biblical prophecies symbolically enacted by the interplay of the comets and the constellations they highlight. One need not mention the many dreams and visions of Christians from all walks, whether pre-trib or post, that point to this sign. We have documented the sign on our website in the articles of the categories, The Divine Monogram and The Eye of the Storm, which we invite you to prayerfully read and consider with the guidance of the Holy Spirit.

First of all, recognize that the sign of the Son of man is a prophetic word of Jesus and not a parable as with the midnight cry. Therefore, it being an end-time prophecy, we should be able to find its place among the prophecies of Revelation by identifying one that describes the features of the sign, clearly depicting what we see in the heavens.

Digital artwork displaying a constellation map set against a dark, star-filled backdrop. A prominent overlay in the shape of overlapping ribbons in orange and blue marks sections, annotated with various dates and coordinates. Various celestial symbols and astronomical elements are subtly integrated within the map.We have already correlated the sign with the royal Alpha and Omega signature of Jesus with the combined paths of comets K2 and E3, but this is a signature or identifying seal, and not a specific prophecy in Revelation’s sequence of events. Is there yet a prophecy in the Revelation that tells the story of this sign in a precise way? Indeed, there is! God chose a special area in the heavens to display this sign—between the two witnesses to His time.

On April 16, 2023, the Lord led us to understand how the highly symbolic story of the two witnesses in Revelation 11 distinctly describes the sign of the Son of man. It is very fitting for this prophetic story to be the setting of the sign that witnesses to the time of the coming of our Lord in glory when He will destroy the wicked.[5] 

This sign comes from the two heavenly witnesses as a token of deliverance for the righteous while it unveils the time of visitation for the wicked, making it an unconsidered harbinger of doom for them. When the two witnesses stand on their feet, their enemies will feel their power:

And if any man will hurt them, fire proceedeth out of their mouth, and devoureth their enemies: and if any man will hurt them, he must in this manner be killed. These have power to shut heaven, that it rain not in the days of their prophecy: and have power over waters to turn them to blood, and to smite the earth with all plagues, as often as they will. (Revelation 11:5-6)

Could it be that the comets that go from one witness of time to the other, serve as moving clock hands that tell the time according to the sequence of the prophecy? If so, then the movements of the comets in relation to the constellations of the sign of the Son of man should give us information regarding the timing of the fulfillment of this fascinating prophecy. But where should we start?

Two Witnesses of Time

The two witnesses of Revelation 11 have been clearly identified in our last article about that topic, The Revelation of Daniel’s Two Witnesses, which was written prior to the discovery of the sign of the Son of man. There we explained how they are the two heavenly clocks at either side of the river of life, represented by the constellation of Eridanus.

A panoramic illustration of the night sky featuring various constellations outlined in vibrant blue lines against a backdrop of stars. The constellations resemble animal and human figures, including symbols like a scale and a ram, alongside associated objects such as a clock and a planter with lush greenery. The deep space setting is dotted with stardust and nebulous cloud formations, creating a sense of vast, celestial wonder.

Those clocks are:

  1. The hourglass or intercessory clock of Orion, which shows Jesus’ blood shed for the salvation of man.[6] This corresponds to a time of mercy, when the gospel went out freely from Christian nations.

  2. The pendulum clock of the Horologium constellation, which illustrates a time of justice when Jesus takes up His power as King. This is a time of war with the Lamb, when the earthly leaders of nominal Christian nations are actively implementing systems to hinder the spread of the gospel through censorship, deceptive propaganda, and monetary control.

This is a solemn time. The battle lines are drawn and God’s people must stand in array against the enemy—not against a political ideology, but against the true enemy who would cause you to sin. Those who have received salvation are empowered by the Holy Spirit to live in victory, not walking according to a lifestyle that is contrary to God’s character, but to stand with our lives in His defense.

While He was on the earth, Jesus’ words to one in sin were: “Neither do I condemn thee: go, and sin no more.”[7] That brief statement and command illustrates the perfect mingling of grace and justice: God’s design is to rescue us from sin and empower us to live a life of holiness that is compatible with His eternal law in heaven. His command makes it clear that there is a time when there must be an end. “Sin no more.” It does not mean that we won’t make mistakes, but that His law has been written in our heart, so that we won’t choose sin, despite the consequences. The Horologium points to the time when that work should be completed—and every Christian is about to be tested.

Complete control and oppression for God’s faithful is being decreed in the financial realm, especially with the looming implementation of global CBDCs. As Revelation says many times, the prize goes “to him that overcometh.” Those who overcome—those who walk by faith in Christ’s sacrifice (symbolized by Orion) and in obedience to His commandments, having Jesus as King of their lives (symbolized by Horologium) are witnesses for Christ at this crucial hour.

In harmony with the principle of progressive revelation, now that we have the understanding of the sign of the Son of man, which is marvelously orchestrated by the hand of God with the trajectories of comet E3 (going from Orion to the Horologium) and comet K2 (going from the Horologium to Orion) precisely on the area of the heavens between these two witnesses of time, we will explore the timely message the Lord is providing to help us stand firm in the midst of the storm.

A digital illustration of the night sky dotted with stars, featuring three celestial constellations connected by colorful lines representing their astronomical configurations. The constellations resemble ancient symbols, set against the deep dark backdrop of space.

Lying on the Street

Revelation 11 describes the two witnesses as having power to smite the earth with all plagues and as we have already explored in previous articles, we are in that time—the time when the justice of God is being manifested against all unrighteousness. Therefore, since comet K2 struck the midnight hour of the pendulum clock on March 5, 2023, the call has been going out to “Come Out” of Babylon not to receive her plagues.

And I heard another voice from heaven, saying, Come out of her, my people, that ye be not partakers of her sins, and that ye receive not of her plagues. (Revelation 18:4)

The paths of the comets in the sign of the Son of Man are crucial time indicators regarding the impending fall of Babylon.

As comet K2 and comet E3 continue to trace the sign of the Son of Man with their trajectories, they both reach the constellation of Eridanus. Does this have significance for the prophecy? In the aforementioned article, The Revelation of Daniel’s Two Witnesses, we recognized the river Eridanus as the street where the two witnesses lay dead.

And their dead bodies shall lie in the street of the great city, which spiritually is called Sodom and Egypt, where also our Lord was crucified. (Revelation 11:8)

It is here that we pick up the story and review it according to our understanding of the sign of the Son of man. What role do the comets have in telling the story of the two witnesses? The fact that the two witnesses are said to lie in the same street where our Lord was crucified, and that His sacrifice is depicted with the dead body (Phaeton of the legend) “in the street” of the river, tells us that somewhere, sometime, along the river Eridanus, the two witnesses will be shown lying down. Could the cometary clock hands of K2 and E3 tell us when and where in the street, the two witnesses (Orion and Horologium) are lying?

Let us follow the trajectories of the comets to find the answer to our questions. If we begin, for example, with K2 departing from the Horologium on the left (as shown above) as of March 12, 2023, and we look for the first time when the comet is precisely in the “street” of the river—as defined by the stars—we come to the following date: April 8, 2023.

A digital illustration depicting a celestial-themed scene with a large vintage clock adorned with Roman numerals floating among the stars. The clock is integrated into an ethereal blue figure outlined with a constellation representing a part of the Mazzaroth. A smaller celestial symbol associated with the Mazzaroth is shown in the upper right. Below, an interface displays the date “2023-4-8” and “Julian Day 0:0:0”.

Likewise, if we switch over to comet E3 and look for when it is in the river, we come to the date of April 16, 2023.

A digital rendering of a constellation from the Mazzaroth, depicted as a man holding scales, set against a starry night sky. A software interface showing date and time is visible at the bottom.

Notice that although the artwork of the river is fading out, the constellation line (the “street”) is well defined by the stars. We have found the points where the two witnesses or heavenly clocks are represented as lying in the street. The comets serve as representatives of the witnesses to enact the prophecy, since the constellations themselves cannot move. Just the fact that these two comets, which go to their respective witness of time, both cross the Eridanus after the sign of the Son of man began on March 12, is quite remarkable!

But are these dates important? If so, what do they indicate for you and me? Will the world finally recognize the testimony of these witnesses as they come to life and stand on their feet? Will Jesus’ character of TIME be embraced by those who claim to love His appearing? Will you allow the face of Jesus (the face of Time depicted at either side of the sign) to shine upon you, and look up with belief in the sign of the Son of Man?[8] 

The Lord bless thee, and keep thee: The Lord make his face shine upon thee, [the face of the clock] and be gracious unto thee: The Lord lift up his countenance upon thee, [in the revelation of the sign of the Son of Man] and give thee peace. And they shall put my name, [Alnitak, the Wounded One of Orion] upon the children of Israel [you!], and I will bless them. (Numbers 6:24-27)

The Spirit of the Resurrection

April 8, 2023, when comet K2 was in the street of the river as a representative of the Orion witness, was no ordinary day. It was a day when the Spirit of life was moving:

And after three days and an half [of lying dead] the Spirit of life from God entered into them, and they stood upon their feet; and great fear fell upon them which saw them. (Revelation 11:11)

Would it be a surprise to you to learn that on God’s calendar, that day was a special day? It was the Hebrew anniversary of the very day when Jesus Christ was raised from the dead! The timing of the comet’s passage through the street of the river could not have been more perfect. The Spirit of life—the power of resurrection—is illustrated to enter into the first witness through the comet’s entrance into the street on resurrection day.

As God paints His masterpiece with the strokes of time, the beauty is only amplified when we consider the second witness. The two witnesses are always mentioned together in this prophecy. They complement each other in aesthetic symmetry. The second comet’s entry into the street of the river on April 16, 2023, fulfills the last word of the phrase, namely that the Spirit of life entered into “them.” Until then, it had just entered one witness. Is there something comparable in that date to justify calling it the Spirit of life for the second witness as well?

Looking at the symmetry of God’s word, we could even deduce where to find it. The spring feasts are complemented by the autumn feasts; the northern hemisphere by the southern; the ancient, literal Israel by the modern, spiritual Israel of faith. Ancient Israel was localized around a specific, geographical region in the northern hemisphere called Canaan, and God chose a place among them to put His name for people to come to Him there. The Light of Israel was to lighten the world from there.

But unto the place which the Lord your God shall choose out of all your tribes to put his name there, even unto his habitation shall ye seek, and thither thou shalt come: (Deuteronomy 12:5)

But the Israel of faith that lives today is a global people, unbound to the Jewish ceremonial customs and rites. Furthermore, God has chosen a place in the southern hemisphere to lighten the earth with His heavenly glory. To this place the Israel of faith should seek, and be sealed in His name.

Interestingly, below the earth’s equator, the seasons are opposite. That means that when it is the first month of spring in the north with the Passover feast, in the south, it is the seventh month with the feast of tabernacles and the beginning of autumn. For the Christian, these feasts are brought together as one.

A comparison table showing calendrical differences between Ancient Israel, represented as the Land of Canaan, and a conceptual Global, Spiritual Israel across both Northern and Southern Hemispheres. The table outlines dual seasonal flows for both regions with color-coded representations; green for spring in the First Month, and yellow and orange for autumn in the Seventh Month.

But April 16, 2023, was the 24th day of the Hebrew month—days after the end of the week-long feast! What significance could it have?

On the Hebrew calendar for the southern hemisphere, that day was the 24th day of the seventh month. The remarkable thing is that for the northern hemisphere, the 24th day of the seventh month is exactly Jesus’ birthday! But a birthday doesn’t change when one moves to the opposite hemisphere. Now we see that there is a complementary day of festivity according to the southern hemisphere.

A color-coded chart representing different significant dates and tracking them across global regions and calendar divisions. Labels include “Global, Spiritual Israel,” “First Month” with Spring in the Northern Hemisphere and Autumn in the Southern Hemisphere, and “Seventh Month” similarly showing Autumn and Spring. Additional notable events like “Resurrection” and “Jesus’ Birthday” are indicated, aligning with specific dates.

Instead of Jesus’ birthday, the comet’s entrance into the Eridanus street suggests that the fulfillment of this prophecy is itself what makes the day special! It is the resurrection day of the two witnesses! Are not a resurrection and a birth both a time when the spirit, or breath of life, enters into the body? We have scarcely made it through the first phrase of the prophecy of the new life of the witnesses, and already God has outdone Himself!

When the spirit of life entered into the first witness on April 8, we see the Eridanus constellation line pointing to the human figure in the water (see the image below), which is representative of Jesus at the time of His baptism, a symbol for death and resurrection to a new life in Christ.

Digital astronomical simulation depicting a constellation from the Mazzaroth in the night sky, connected by blue lines forming a geometric shape. A date and time panel shows April 8, 2023. Visible are various stars and a comet labeled “2017 K2 (PANSTARRS)” with its trajectory marked by lines. A coin-like object with a pentagram is shown in motion near the comet.

This depiction is at the very center of the sign of the Son of Man, and it points everyone to the self-sacrificing character of Jesus. When we die to self and are baptized into Christ’s death, we receive the gift of His life and conquer the kingdom of Satan, which is death.

For the wages of sin is death; but the gift of God is eternal life through Jesus Christ our Lord. (Romans 6:23)

A digital depiction of three constellations connected by colorful lines against a starry night sky. Illustration showing two star constellation figures from the Mazzaroth in a night sky, detailed with a graphical overlay of blue lines connecting stars to outline the figures. The upper figure represents a man holding a cluster of stars, while the lower figure is a rabbit facing left. The interface displays date and time settings, indicating the observation on April 16, 2023.

Standing Amid Enemies

The Spirit of life having entered both witnesses by April 16, 2023, the two comets were prepared for the next leg of their journey of prophetic fulfillment. The timing of that readiness is worthy of deeper reflection, however. Comet E3 showed the entrance of the Spirit of life into the corresponding Horologium witness about the time of the evening sacrifice—the time when Jesus died on the cross.[9] This highlights the sacrifice of Jesus that gives Him the right to become the King of the earth.[10] His coming is announced in the Horologium constellation, which represents Him as King of kings and Lord of lords.

It is the sacrifice of Jesus that enables His witnesses to stand. They do not stand in their own strength, but by faith in His Spirit. Having been baptized into His death, they are raised to a secure footing in the newness of life.

Therefore we are buried with him by baptism into death: that like as Christ was raised up from the dead by the glory of the Father, even so we also should walk in newness of life. (Romans 6:4)

Comet K2 entered at the body in the river, pointing to the death and resurrection of Jesus as the first witness (Orion) through the symbolism of baptism. The second cometary clock hand (E3) operates for the Horologium witness, having entered the Eridanus between the foot of Orion and his footstool, represented by Lepus (as explained in The Unclean Hare and the Pineapple). In that position, it calls to mind the promise that Jesus would make His enemies His footstool:

But this man [Alnitak, the Wounded One of Orion], after he had offered one sacrifice for sins forever, sat down on the right hand of God [Alnitak’s position in the belt stars, which symbolize God’s three-seat throne]; from henceforth expecting till his enemies be made his footstool [represented in Lepus]. (Hebrews 10:12-13)

Knowing that Lepus represents the enemies of God from this verse and the constellation’s history as the footstool (or throne) of Orion, it follows that it stands for the enemies of God. In an upcoming article, we will consider some details of the battle during the time when the three comets are in Lepus. In the context of the two witnesses, the chapter is about their struggle with their enemies, who finally become fearful after the two witnesses stand to their feet.

Illustration depicting a celestial map with constellations and stars. Prominently featured are depictions of the stars and outlines of a figure identified with Mazzaroth kneeling next to a hare constellation, known scientifically as Lepus. Annotations include references to celestial events on specific dates in April and May.

And after three days and an half the Spirit of life from God entered into them, and they stood upon their feet; and great fear fell upon them which saw them [including their enemies]. (Revelation 11:11)

It is important to note that although some parts of the prophetic description may seem trivial, when we understand that they are written in symbolic terms, every action points to a process that is to unfold in the fulfillment. Furthermore, the text does not demand that the reason that the observers were greatly afraid was because the two witnesses stood to their feet. It simply states the sequence of events. First, the witnesses stand up firmly on their feet, and then there is a cause that produces great fear. The mention of “them which saw them” may be understood as a reference to the constellation of the enemies where the comets enter, and thus, they “see” the comets in their space.

When the two witnesses stand up on their feet, they become aware of their enemies again. In the heavenly depiction, it suggests that the comets should enter the constellation of Lepus to complete the description. Notice also the emphasis on the feet. Why does the Bible mention that they stood on their feet, as though there were another way they could stand? In the heavens, this emphasis on the feet can be seen, since before entering Lepus, both comets lastly pass under the feet of a human figure—a posture that shows dominance over the hare.

Great Fear Unexpectedly

The constellation of Lepus represents those who have made themselves the enemies of God. However, we saw a special hint to a particular nation; the comets mark an X over Lepus like the solar eclipses of 2017 and 2024 mark an X over the United States.

An artistic composite image featuring two distinct panels. The left panel portrays a constellation represented as a rabbit set against a starry night background, intersected by two diagonal lines, one yellow and one green. The right panel shows a map of the United States highlighted with two crossing lines annotated with dates “August 21, 2017” and “April 8, 2024”, indicating paths of celestial events across the continent.

The United States is a professedly Protestant nation, but it has long been steeped in apostasy without repentance.[11] As in Ezekiel’s vision of the men with slaughter weapons going through Jerusalem—a people once favored by God—so today, the angels of death have their sights on the United States. Many of God’s people living in the United States receive prophetic messages relating to the judgment coming over that nation, but they have no fear. Why? For a few, it may be because they trust that the Lord will protect them amid the storm. But for most, their trust is in their own wisdom or that of their pastors who have told them that they will not be here when that judgment comes.

While we love our brethren who still hold to this teaching, we recognize that it is a very dangerous doctrine, because it is at odds with the character of sacrifice that our Lord taught us. Is it brotherly love to desire to escape tribulation and abandon those who might come to Christ through your witness in time of trouble? Is that what Jesus would do? Would He not rather submit to any amount of tribulation if it would enable Him to reach more people with the gospel of His love? Did our Savior, the Wounded One for our transgressions,[12] not command us to take up our cross and follow Him, denying ourselves?

And he said to them all, If any man will come after me, let him deny himself, and take up his cross daily, and follow me. For whosoever will save his life shall lose it: but whosoever will lose his life for my sake, the same shall save it. (Luke 9:23-24)

Have you desired to save your life through the rapture, or are you willing to lose it through the tribulation? Face the question head-on and be honest with the Lord!

And he that taketh not his cross, and followeth after me, is not worthy of me. (Matthew 10:38)

As the comets entangle themselves in Lepus, it points to a conflict that many will have expected to have been worthy to escape, though they have not cultivated the sacrificial character of Christ. Yet the same command to watch (to learn the time) that you may be worthy, also enjoins us to desire to stand like the two witnesses in the face of their enemies, enduring until the Son of man appears before them:

Watch ye therefore, and pray always, that ye may be accounted worthy to escape all these things that shall come to pass, and to stand before the Son of man. (Luke 21:36)

For those connected with the White Cloud Farm, our continual frustration is with the stubborn spirit of prejudice among God’s people. No matter how compelling the evidence is for the truth in the heavenly revelations, the culture of willful ignorance of the time prevails and leads the vast majority of those waiting for the Lord to turn from the truth. Instead, they embrace the soothing doctrine that they need not fear the tribulation—not because the Lord will be their strength and will use them to reach others through it, but because they expect to have the easy way out and won’t have to endure it.

What then will come to these, our beloved, but terribly mistaken brethren? It is at that time, when both comets are in Lepus, that the next part of the story is to take place:

…and they stood upon their feet; and great fear fell upon them which saw them. (Revelation 11:11)

Great fear. All that many had loved about the rapture will be seen to be wrong. They will be sadly unprepared to endure tribulation. Many will prove “once saved always saved” wrong as the houses that Christians built on sand collapse and they participate in the great falling away.[13] Yet others, despite their wrong beliefs, have nevertheless cultivated a sacrificial character to a degree. They will humbly come to the light as the Lord corrects them with hard discipline. For these we write.

The Same Hour

The crossing of the comets in Lepus takes place over the course of exactly 15 days, or one prophetic hour according to the day-for-a-year principle.

A horizontal Gantt chart representing the timeline of a comet's trajectory through the constellation Lepus, with key dates and events marked from April 23 to July 10. The chart indicates intersecting paths named S3, E3, and K2 within specific date ranges, highlighting significant movements like “K2 crosses E3” around May 26 to June 9.

Though this is still in the future, the Lord has given understanding about important developments that will transpire during this time, which will be treated in an upcoming article. We can see an hour marked by the crossings of these two comets, and there is an hour mentioned in the text. There are a few things described in the next verse before the hour is mentioned (we will come back to them shortly), but notice how the hour is presented:

And the same hour was there a great earthquake, and the tenth part of the city fell, and in the earthquake were slain of men seven thousand: and the remnant were affrighted, and gave glory to the God of heaven. (Revelation 11:13)

Does “the same hour” refer to the same moment when the preceding events began, or does it refer to a span of up to one hour afterward—or a favorite of our higher-dimensional God, both? An earthquake symbolizes an earth-shaking event, and in prophecy, the United States has been identified as the “earth”.[14] Therefore, this could point to an earth-shaking event related to the US.

When Babylon feels its first truly destructive blow as a tenth of the global city falls, Christians will surely begin to see the error of their ways. The seven thousand slain may refer to the many (1000) Christians (×7) who lose their way because they put their faith in their pastors rather than in God, while the rest learn a godly fear of the weakness of man, and depending on their Lord by faith, give glory to “the God of heaven”. This expression points specifically to His role as the One who has orchestrated all the marvelous heavenly signs.

But when the fall of Babylon is described in detail in Revelation 18, it is expressed primarily in terms of finance, commerce, and trade. Thus, it is entirely possible that the fall of the tenth part of the city points to the fall of the US dollar. This is not farfetched considering what the Treasury Secretary Janet Yellen warned about on April 25, the day when comet E3 of the Horologium witness entered Lepus.

US warns of ‘economic catastrophe’

A hand holds a burning 100 US dollar bill, with flames consuming the edge as Benjamin Franklin's portrait is visible.A failure by the US to raise its debt ceiling would lead to an economic and financial crisis in the country, Treasury Secretary Janet Yellen has cautioned, urging lawmakers to act and not wait “until the last minute.”

On the same day, shares of First Republic Bank dropped 50%, after reporting the more than 100 billion USD that customers had withdrawn from their accounts in the first quarter alone, accounting for a majority of their holdings.[15] 

In the prophecy, a literal translation for the “men” who are slain is “names of men”. We have previously identified the application as the names and faces of people printed on the bills.[16] When the dollar falls, the George Washingtons and Benjamin Franklins are slain. It could be that the 7000 slain simply represents the many (1000) dollars that would be slain of that Christian (×7) nation. Time will tell what exactly the symbolism points to.

The United States was a country blessed by God and founded in good principles of liberty, and was thus like a lamb. But it speaks like the dragon,[17] even inviting him (Pope Francis) to speak to its joint session of congress in 2015 in a signal display of loyalty to his agenda of same-sex marriage, Covid-19 vaccination, and distribution of wealth (using CBDCs). With good reason, many Christians connect this country, whose global currency dominance is showing signs of waning, with Babylon, and it is in the crosshairs for receiving God’s financial plagues as the god of mammon is judged.

A detailed celestial chart displaying various constellations under a starry sky. Highlights include Canis Major and Lepus with outlined figures of a large dog and a rabbit, respectively. Bright stars, Sirius and Rigel, are labeled. Lines connecting the stars form the shapes of the celestial figures, overlaid with geometric boundary lines and celestial coordinates.The three comets that we presently see entering Lepus reflect the three divinely sent angels that visited Abraham before the destruction of Sodom and Gomorrah.[18] Two went down to the corrupt city while Abraham bargained with the Other for the lives of the righteous therein. This is what we see today. Like righteous Lot, God’s people are vexed by the sinfulness of the world around them, but they have not left the confused doctrine of Babylon. The two heavenly messengers whose paths trace the sign of the Son of Man (comets E3 and K2) have come to take His people by the hand and rush them out before they are consumed in her indiscriminate plagues.

Go ye out of her to meet your Bridegroom! Flee the Babylonian church-state ship and abide safely in the great fish God has provided for our protection and sustenance through this time of woe. In Revelation 18, the complete and utter fall of Babylon is described in three parts, while in Revelation 11, which we see enacted by the comets in Lepus, only ten percent of the city is prophesied to fall.[19] May God’s people flee before the 90% falls in three hours without mercy.

“Come up Hither”

The great earthquake that destroys a tenth of the city comes at the same hour as the events of the previous verse, where the two witnesses hear a great voice from heaven:

And they heard a great voice from heaven saying unto them, Come up hither. And they ascended up to heaven in a cloud; and their enemies beheld them. (Revelation 11:12)

Nighttime landscape under a celestial sky featuring bright celestial bodies and multi-colored atmospheric optical phenomena above a horizon of distant city lights and sparse land.Do we see this as well at the expected time? Once both witnesses stand up as the two comets enter the constellation of Lepus by May 10, the great fear may come upon those represented by Lepus, who see them. The great voice must be represented by comet S3, which entered Lepus on April 23. On this date, the world witnessed a great heavenly manifestation. SpaceWeather reported a CME hitting Earth’s magnetic field producing a severe electromagnetic storm with bright, green auroras reaching far from the poles.

The Lord drew the attention of the world to look up with the magnificent display in the heavens at the time when His cometary messengers transition into the area of dispute for the throne: Lepus, the footstool of Orion (representing Jesus).

Comet S3 leaves the constellation on May 27, and here lies a fruitful clue about why this small comet, which represents the Holy Spirit,[20] is said to speak with a great, loud voice rather than His usual still, small voice. On God’s calendar, May 27, 2023, is the day of Pentecost. Most people think of the disciples in the upper room who received the Holy Spirit on that day, but this is not its only significance! The command to “come up hither” on Pentecost, originally called the Feast of Weeks, is a clear reference to another event that happened on that day centuries before the disciples received the Holy Spirit. It was on that day that Moses was called up to the top of Mt. Sinai to receive the Ten Commandments from God.

And the Lord came down upon mount Sinai, on the top of the mount: and the Lord called Moses up to the top of the mount; and Moses went up. (Exodus 19:20)

And that was no quiet affair. In fact, the setting in the heavens is very similar:

And it came to pass on the third day in the morning, that there were thunders and lightnings, and a thick cloud [comet S3] upon the mount, and the voice of the trumpet exceeding loud [the seventh trumpet?]; so that all the people that was in the camp trembled [“great fear”]. (Exodus 19:16)

The linguistic clues point directly to the giving of the Ten Commandments at Mount Sinai, and the loud voice of God from the burning, quaking mountain capped with clouds of smoke, lightning, and thunder, match the description of a volcano to a tee. We will refrain from speculating regarding a literal application to volcanism for that day, but rather focus on the theme that the prophecy is about: the two witnesses.

The tables of the commandments are also two witnesses,[21] two tables of testimony that reflect God’s character of love as the heavenly ark opens. Moses climbed up the mountain, but the people trembled with fear in the camp, for they had never heard the voice of God directly. Will the people of God today see the sign of the Son of Man at last and give glory to the God of heaven?

Could it be that when the command is heard to come up hither, the wicked rulers with their evil plans will fear and tremble in their bunkers as they face the wrath of the Lamb?

And [especially the world leaders] said to the mountains and rocks, Fall on us, and hide us from the face of him that sitteth on the throne, and from the wrath of the Lamb: For the great day of his wrath is come; and who shall be able to stand? (Revelation 6:16-17)

The day that comet S3 leaves Lepus, May 27, 2023, marks exactly one year until the sign of the Son of man is fully traced in heaven[22] and Jesus’ physical deliverance from the digitally enforced bondage of this earth (through CBDCs) will usher us into His eternal rest. This is the culminating day of the Lord, of which the Bible has so much to say! It is the day when S3 calls to the two witnesses to ascend up to heaven on the paths of their trajectories.

The comets are then still in Lepus, meaning that, regarding the two witnesses, “their enemies beheld them” as the prophecy says![23] Their ascent itself, however, spans the course of the sign until the comets take their place in one year as the witnesses of time, this time written not in tables of stone, but sealed in the fleshy tables of your heart by the Spirit of God! Oh, that the corporate scars of wounded pride would be healed, and the Word of Time would be enthroned in the hearts of God’s people!

Forasmuch as ye are manifestly declared to be the epistle [or testimony] of Christ ministered by us, written not with ink, but with the Spirit of the living God; not in tables of stone, but in fleshy tables of the heart. (2 Corinthians 3:3)

As that day of darkness and distress hastens, we invite the church to hold the one New Testament feast that Jesus Himself instituted, saying that it should be done as often as desired until He comes.[24] Let us prepare ourselves for that day as when God came down on Sinai.[25] Reflecting on the experience of the disciples on the day of Pentecost, who were of “one accord” when the Holy Spirit fell on them in the form of tongues of fire, we seek to live in peace with each other, extending forgiveness to all. This was the lesson of humility that Jesus taught His disciples at the last supper.

Only at the mutual sacrifice of pride can we be in one accord with each other. How Jesus’ heart must have yearned for His bickering disciples, knowing that they would soon be thrust into a terrible trial that their pride prevented them from being prepared for. Has your experience led you to choose genuine peace with God and your brethren? Or is there still strife among you about who is the greatest, the most Christian, the most right? Let it go. Let it all go now and let the peace of Jesus that passes understanding be yours.

As the disciples were gathered in the morning of Pentecost, so we invite you, with cleansed hearts in one accord, to partake of the symbols of Christ’s body and blood in the morning of Sabbath, May 27, 2023. It is a High Sabbath, being both Pentecost and the weekly Sabbath, and is thus of special significance to High Sabbath Adventists! Every High Sabbath is a memorial of Jesus’ sacrifice of love, since He rested in the tomb on a High Sabbath. May the blood of Jesus be applied to the doorposts of your heart as you partake of the Lamb of God within.

Is it a wonder that the sign of the Son of man occupies the very chiastic center of the book of Revelation—the transition between the middle chapters, Chapter 11 and Chapter 12? This is the central point in the mystery of God in the Revelation of Jesus Christ; the unveiling of the sign of the Son of man.

The Revelation of Jesus Christ [in the witnesses of time], which God gave unto him, to shew unto his servants things which must shortly come to pass [as indicated by the sign of the Son of man] (Revelation 1:1)

But it would be incomplete to speak of the day of the Lord beginning on May 27, 2023, without emphasizing the fact that it is also the memorial anniversary of Jesus’ own resurrection on May 27, AD 31! Jesus also ascended to heaven that day, before returning to give His disciples spiritual sustenance to endure until He would be reunited with them through the outpouring of His Holy Spirit.[26] 

Jesus saith unto her, Touch me not; for I am not yet ascended to my Father: but go to my brethren, and say unto them, I ascend unto my Father, and your Father; and to my God, and your God. (John 20:17)

How significant is that time this year!? Exactly one year later, on May 27, 2024, it will be the time of the first resurrection and rapture of all the saints.

And as Jesus was raised from the dead as the First fruits on that day, may there also be a spiritual resurrection—an awakening to the time—among God’s people, so that they can fulfill their high calling and having done all, to stand[27] through that terrible day, the year for His redeemed to shine.

For the day of vengeance is in mine heart, and the year of my redeemed is come. (Isaiah 63:4)

The Lord has promised that He will not do anything before relating it to His prophets.[28] Heed the warning and the testimony given by the two witnesses, so that you, too, can give glory to the God of heaven.

…and the remnant were affrighted, and gave glory to the God of heaven. (Revelation 11:13)

This is a promise that His people, His remnant, will at last recognize the testimony of the two witnesses in the sign of the Son of man and that the virgins will yet be roused from their slumber. He who knows the end from the beginning, who is writing His Alpha and Omega signature in the heavens, gives understanding about what elapses in the world to grant hope and assurance to face the time without falling for the deceptions of the enemy. Don’t miss the coming articles, where you will learn more about what the Lord has revealed regarding the battle with the enemy and the Lord’s provision for us. When obliged to submit to the beast’s ideology and receive its genetic number, may all the wise virgins with the oil of understanding stand firm and trust in the provision and deliverance of the Lord, whatever the cost.

1.
Read the article When God Visits Babylon to have an overview about the times the comets go into Lepus. ↑
2.
See Spaceweather.com – HOW LOW DID THE NORTHERN LIGHTS GO? ↑
3.
C/2021 S3 (PANSTARRS), C/2022 E3 (ZTF), C/2017 K2 (PANSTARRS), respectively. ↑
4.
Hebrews 6:17-20 – Wherein God, willing more abundantly to shew unto the heirs of promise the immutability of his counsel, confirmed it by an oath: That by two immutable things, in which it was impossible for God to lie, we might have a strong consolation, who have fled for refuge to lay hold upon the hope set before us: Which hope we have as an anchor of the soul, both sure and stedfast, and which entereth into that within the veil; Whither the forerunner is for us entered, even Jesus, made an high priest for ever after the order of Melchisedec. ↑
5.
Deuteronomy 17:6 – At the mouth of two witnesses, or three witnesses, shall he that is worthy of death be put to death; but at the mouth of one witness he shall not be put to death. ↑
6.
In fact, the river Eridanus also represents the flow of blood and water that came from Jesus’ side for humanity. ↑
7.
From John 8:11. ↑
8.
Hebrews 12:25 – See that ye refuse not him that speaketh. For if they escaped not who refused him that spake on earth, much more shall not we escape, if we turn away from him that speaketh from heaven: ↑
9.
Matthew 27:46 – And about the ninth hour [3:00 pm] Jesus cried with a loud voice, saying, Eli, Eli, lama sabachthani? that is to say, My God, my God, why hast thou forsaken me? ↑
10.
Revelation 11:15 – …The kingdoms of this world are become the kingdoms of our Lord, and of his Christ; and he shall reign for ever and ever. ↑
11.
For example, on June 26, 2015, its Supreme Court ruled same-sex marriage—the image of the beast—to be legal. This influenced many other countries to support this abomination in their legislation. The U.S. also led in delivering Covid-19 vaccines—the number of the beast—to many countries, and imposed vaccine mandates, pushing many to their eternal death. ↑
12.
Isaiah 53:5 – But he was wounded for our transgressions, he was bruised for our iniquities: the chastisement of our peace was upon him; and with his stripes we are healed. ↑
13.
2 Thessalonians 2:3 – Let no man deceive you by any means: for that day shall not come, except there come a falling away first, and that man of sin be revealed, the son of perdition; ↑
14.
This was explained in The Princess and the Dragon, and is based on the fact that the United States was not highly inhabited like Europe which corresponds to the sea of peoples, as expressed in Revelation 17:15 – And he saith unto me, The waters which thou sawest, where the whore sitteth, are peoples, and multitudes, and nations, and tongues. ↑
16.
See the article The Two Witnesses under the heading Seven Thousand Slain ↑
17.
Revelation 13:11 – And I beheld another beast coming up out of the earth; and he had two horns like a lamb, and he spake as a dragon. ↑
18.
Genesis 18:2 – And he lift up his eyes and looked, and, lo, three men stood by him: and when he saw them, he ran to meet them from the tent door, and bowed himself toward the ground, ↑
19.
Revelation 11:13 – And the same hour was there a great earthquake, and the tenth part of the city fell, and in the earthquake were slain of men seven thousand: and the remnant were affrighted, and gave glory to the God of heaven. ↑
20.
This can be understood by the fact that it first circles the constellation of the dove that represents Him, before it enters into Lepus. ↑
21.
Read the article The Ark of the Testament is Opening to learn how both heavenly constellations are related to the two tables of stone. ↑
22.
We often extend the sign to include the seven days of ascent to the sea of glass, but properly, the sign must end once Jesus returns in person! ↑
23.
Inasmuch as one on earth can only see the beginning of an ascent to heaven, the enemies only see the comets for a relatively short period in comparison with their entire journey through the sign. ↑
24.
1 Corinthians 11:26 – For as often as ye eat this bread, and drink this cup, ye do shew the Lord’s death till he come. ↑
25.
Exodus 19:10-11 – And the Lord said unto Moses, Go unto the people, and sanctify them to day and to morrow, and let them wash their clothes, And be ready against the third day: for the third day the Lord will come down in the sight of all the people upon mount Sinai. ↑
26.
John 20:21-22 – Then said Jesus to them again, Peace be unto you: as my Father hath sent me, even so send I you. And when he had said this, he breathed on them, and saith unto them, Receive ye the Holy Ghost: ↑
27.
Ephesians 6:13 – Wherefore take unto you the whole armour of God, that ye may be able to withstand in the evil day, and having done all, to stand. ↑
28.
Amos 3:7 – Surely the Lord God will do nothing, but he revealeth his secret unto his servants the prophets. ↑
A symbolic representation in the sky, with vast fluffy clouds and a small enclosing circle featuring astronomical symbolism elevated above, alluding to the Mazzaroth.
Newsletter (Telegram)
We want to meet you soon on the Cloud! Subscribe to our ALNITAK NEWSLETTER to receive all the latest news from our High Sabbath Adventist movement first hand. DON'T MISS THE TRAIN!
Subscribe now...
A vivid space scene displaying a vast nebula with radiant clusters of stars, gas clouds in hues of red and blue, and a large number '2' presented prominently in the foreground.
Study
Study the first 7 years of our movement. Learn how God led us and how we became ready to serve for another 7 years on earth in bad times, instead of going to Heaven with our Lord.
Go to LastCountdown.org!
Four men smiling at the camera, standing behind a wooden table with a centerpiece of pink flowers. The first man is in a dark blue sweater with horizontal white stripes, the second in a blue shirt, the third in a black shirt, and the fourth in a bright red shirt.
Contact
If you are thinking of setting up your own small group, please contact us so we can give you valuable tips. If God shows us that He has chosen you as a leader, you will also receive an invitation to our 144,000 Remnant Forum.
Make contact now...

Panoramic view of a majestic waterfall system with multiple cascades plunging into a swirling river below, surrounded by lush green vegetation. A rainbow arches gracefully over the misty waters, and an illustrative overlay of a celestial chart sits at the bottom right corner reflecting the Mazzaroth.

LastCountdown.whitecloudfarm.is (basic study site of the first seven years since January 2010)
WhiteCloudFarm Channel (our own video channel)

© 2010- High Sabbath Adventist Society, LLC

Privacy Policy

Cookie Policy

Terms and Conditions

This site uses machine translation to reach as many people as possible. Only the German, English, and Spanish versions are legally binding. We don't love legal codes – we love people. For the law was made for the sake of man.

A banner featuring the logo “iubenda” on the left with a green key icon, alongside text that reads “SILVER CERTIFIED PARTNER”. The right side displays three stylized, gray human figures.